KENAI PENINSULA BOROUGH | ||||||||||||||
BID TABULATION FOR | ||||||||||||||
KPB Fleet Replacement Vehicles FY2004 | ||||||||||||||
Nikiski Fire | CES | OEM | Public Works | Solid Waste | Roads | Maintenance Department | ||||||||
1 Required | 2 Required | 1 Required | 1 Required | 1 Required | 1 Required | 1 Required | 2 Required | 2 Required | 2 Required | |||||
Bidder's Name | Bid Signed | AK Bus. Lic. | Tax Cert. | Add. Ack. | 1-Ton 4x4 Crew Cab PU, 6-ft Bed, Diesel | 4x4 Full Size, Special Service, SUV | 4x4 Full Size SUV | 4x4 Full Size SUV | Ext.Cab & Chassis, 8-ft Flat Bed, 12 to 18" Stake Rails | 3/4-Ton 4x4 PU w/Plow, Ext. Cab, 6-Ft Bed | 3/4-Ton 4x4 PU w/Plow, Ext. Cab, 8-Ft Bed | 1-Ton Cargo Vans | 3/4-Ton 4x4 PU, Ext.Cab, 8-Ft Bed | 1/2-Ton 4x4 PU, Ext.Cab, 6-Ft Bed |
Hutchings Chevrolet | X | X | X | X | NO BID | $31,795.00 | $31,788.00 | $31,312.00 | NO BID | $28,358.00 | $28,380.00 | $25,425.00 | $24,160.00 | $22,328.00 |
Kenai Chrysler Center, Inc. | X | X | X | X | $33,500.00 | $31,531.00 | $30,681.00 | $26,499.00 | NO BID | $28,908.00 | $28,237.00 | NO BID | $25,570.00 | $23,708.00 |
Great Bear Ford | X | X | X | X | $32,859.50 | 11/6/03 Bid withdrawn | 11/6/03 Bid withdrawn | 11/6/03 Bid withdrawn | $41,098.81 | $28,601.67 | $28,411.15 | $26,546.34 | $24,434.15 | $26,172.67 |
BID OPENING: November 5, 2003 - 2:00 PM - Conference Room C | KPB OFFICIAL: | |||||||||||||
Mark Fowler, Purchasing & Contracting Officer | ||||||||||||||